This week, I had assisted Khairul Azmi to complete the proposed Master Document register for Sabah Oil and Gas Terminal. This document contains the tasks to be done in certain project. The tasks are divided into several parts. Engineering procedures, operation procedures, welding procedures, QAQC procedures, marine procedure and as built report are the parts in the Master Document.
I also had been assigned by Azly Othman to do the weight calculation for the A-Frame pontoon. The calculation need to be done by each part. Then, he reviewed my calculation and used it as his reference for him because of some changes on the design.